Thursday, June 30, 2005

June 30, 2005



I have added a pull down attic access. You can also see the resurfacing of the ceiling.

Wednesday, June 29, 2005

June 29, 2005


We will put the heating unit in the attic above the back house and the new floor will give us extra storage space.

June 29, 2005


I have started to refinish the ceilings in the upstairs of the back house.

Friday, June 24, 2005

June 24, 2005


We have the sub flooring down in the bathroom, as soon as we get the inspection we will be ready to put on the vinyl flooring.

Thursday, June 23, 2005

June 23, 2005


We installed the hardwood floor using old tongue and groove board that we had saved from the back room tear off. This is the closet area above the new ADA bathroom.

Tuesday, June 21, 2005

June 21, 2005

The student intern work day went well. We picked up the outside of the building and started some inside cleaning too. A big thanks to the student interns and Tom.

June 21, 2005

All the ruff in plumbing is done. After all the interior finish work is finished we will finish the final steps of the plumbing work by installing the fixtures.

Friday, June 17, 2005

June 17, 2005

We have finished all the upstairs framing, including, two closets and the hall way.

Friday, June 10, 2005

June 10, 2005

Today we finished all the downstairs framing. Next week we will finish the upstairs closets, then we will have the electrical, plumbing and hvac installed.

Thursday, June 09, 2005

June 9, 2005

We now have the walls framed in, and can start on the details of the counters and the closets.

Wednesday, June 08, 2005

June 8, 2005

We are framing in the new wall and securing the existing stair case.

Tuesday, June 07, 2005

June 7, 2005

Building new walls and extending the floor joists will keep the new office area structurally sound.

Monday, June 06, 2005

June 6, 2005

After a long anticipated meeting with the City we are back to work on the Brown house. We are framing in the ADA bathroom and finishing the stairs, hallways, closets and offices. Here we are drawing out the floor plan and fastening the floor plates to start the framing.